Contents
Obtain DPCC License is a process that every industry needs to go through to legally operate in the NCR. (Delhi Pollution Control Committee) is an independent governing body that was instituted by the Delhi government under the administration of the Central Pollution Control Board (CPCB). This body was established on 1st June 1991. Every power and function of CPCB has been transferred to DPCC.
This organization was created to spread awareness about sustainable development that also guarantees an improvement in the “environment quality” of the NCR.
Delhi comes under the Air Pollution Control Area by section 19 (1) of the Air Act. This means that no industrial plant is allowed to emit any type of pollutant (be it solid, liquid, or gaseous) into the environment with the prior consent of the DPCC.
This certificate functions as a bond that makes sure that every industry works in such a way that it doesn’t harm the environment.
In case your industry discharge waste in sewer, land, well, or stream, then you must apply for a DPCC license today.
CTE is the primary step for any industry/trade and activities involved in manufacturing processor and/or emitting pollution, by way of water/air/noise pollution.
This is a certificate that is a must for every industry, as per the Water Act, 1974 and Air Act, 1981. Every industry needs to obtain this before establishing an industry.
The validity for this certificate is of 1 year only, but if an industry is not able to establish within a year then it can apply for renewal. But if the period expires and there is no renewal, then the industry owner has to apply for the CTE certificate again.
Following 5 sections comes under Consent To Establish:
The same acts mentioned above, provide details about consent to Operate. After obtaining the Consent to Establish, the industry needs to ascertain the Consent to Operate.
The validity of this certificate is of 5 years in the case of the Orange category and 10 years in the case of the Green category. Once this period expires, the industry needs to renew this certificate with the DPCC.
Within 4 months of the receipt of the application of consent, DPCC is to grant the consent to establish. Once all the other formalities such as MCD license, power-water connection, CETP membership (if CETP membership exists) is through, then the industry can get the Consent to Operate.
Any individual or business entity that generates, collects, receives, stores, transport, treat, disposes and/or handles any kind of industrial waste in any manner, except clinics, dispensaries, pathological laboratories, blood banks providing their services to less than 1000 patients/month. All of these institutions need to make an application in Form I to the DPCC for grant of CTO and CTE.
For this, you need to submit the following documents online:
The following are the charges decided by the Government:
Business entity | Fee charged |
---|---|
The operator of the facility of Bio-medical waste | Rs.10,000/annum |
Transporter of Bio-medical waste | Rs.7,500/annum |
Clinics, path-labs, and blood banks | Rs.1,000/annum |
Veterinarian Institutes, Dispensaries, and Animal houses | Rs.1,000/annum |
Hospitals, nursing homes, and health care establishments (up to 4 beds) | Rs.100/bed per annum (from 5th bed onwards) |
Health care establishments/units run by government/ government body/Non-Profit Organization | Rs.100/annum |
All the industries coming under the Red category are not to obtain DPCC consent. This is because these are extremely polluting industries, having a pollution index of above 60. These industries cannot obtain the certificate, as these are not permitted to set up in the NCR.
Including this, all the industries falling under the White category need not obtain consent as well. This is because these industries are technically non-polluting, having a pollution index of 0-20. These can be set up without consent in the NCR.
After you’re through with getting enough information so as to why is it important to obtain DPCC license and the process for it, why don’t you use our services for the same? We at LegalRaasta take great pride in ensuring that your process to obtain DPCC license is hassle-free and less time consuming than any other service provider in the market. In case you have any queries regarding the same or other topics such as LLP formation, FSSAI License, Import Export Code Registration (just to name a few), you can contact us at +91 8750008585 or email us at contact@legalraasta.com.
Basis | Consent to Establish | Consent to Operate |
---|---|---|
Process | The industry needs to obtain CTE before setting up the industry | Once the company representative from the pollution control board visits the site to check whether construction is as per the plan, then the company can apply for consent to operate. |
Renewal | There is no need to renew this consent unless the industry hasn’t established the business within a year. | The industry needs to renew this consent after the validity of the same expires. |